Bitumen Storage Facility - QATAR (pre-commencement) Initial civil works and ground works
TEC Projects Ltd
Unit B2 Yeoman Gate
Yeoman Way
Worthing West Sussex
BN13 3QZ UK
Tel: +44 (0) 1903 830033
Fax: +44 (0) 1903 830044
info@tecint.co.uk
© TEC Projects Ltd 2011
65Mt capacity TEC Storage Bitutainers arrive on site Custom-built pumps skid arrive from TEC's UK workshops
Bitutainers are precisely aligned on steel 'H' beams The network of prefabricated pipework is fitted
Safety Railings and Bridges Fitted High Level Pipework Completed
Containerised Thermal Oil Heating Units Circulation Pumps on Skids Installed
TEC Mobile Ship-to-Shore Pump Unit Containerised PMB and Emulsion Plants
Control Room Completed and Distribution Panel Installed Tanks Connected and Pipework Tested
Custom Made Truck Loading Gantry Facility Ready For Commissioning